Expectations: turn these in to your site director/coordinator by the end of the rotation

  • Shift Card: one per shift (total of 12)
  • Patient Logs: one per shift (total of 12) – Paper logs optional. Must submit all patients seen per shift in OASIS
  • Mid-rotation Feedback Form: complete about 1/2-way through and submit to Karmen and Site Director
  • Faculty Observed H&P: complete in the second or third week (don’t wait till the last week) – Preferred and encouraged to be done by an Attending when possible.
  • End of Rotation Checklist: here’s the checklist we use to make sure that you’ve completed everything you need to do